Wharton Dual Language Academy
Houston Independent School District

Muñoz & Company provided architectural and interior design services for the addition and renovation to the existing 1929 Wharton Elementary school. Wharton Dual Language Academy, in the Montrose area, offers a developmental bilingual program. Wharton was built as a small elementary school in 1929. The existing building was renovated and a new three story addition that more than quadruple the size of the original facility was constructed adjacent to the original building. The new structure helps enclose a beautiful courtyard that will be used by the School for various activities. The new main entrance, located on Columbus Street, helps to alleviate heavy traffic congestion on West Gray at the original main entrance. A flex field was created to the north of the new school to serve both school curricula and activities along with Neighborhood use.

Wharton Dual Language Academy is the first school within HISD to offer a com­prehensive bilingual learning program. The original one story school was built in 1928, and it is a landmark for the Montrose area of Houston. As it is much loved by the community, much attention was given to its extensive renovations. The existing school’s exterior walls were protected and repaired, while the interior walls were reorganized to make classrooms meet new size standards and to arrange support spaces into a more successful and functional adjacencies.

The expanded Pre-K and Kindergarten grades were planned to reside in the existing school, and a new three story addition was designed to house the 1st through 8th grade classrooms. The old and new buildings were carefully de­signed to connect in a complementary and sensitive manner.

The existing building and new addition work together to enclose a beautiful courtyard that will be used by the school for various outdoor activities. In work­ing collaboratively with the traffic engineer, a new main entrance to the facility was designed and located to alleviate the heavy traffic congestion experienced during drop off and pick up times at the school. A new flex field was designed to serve the school’s physical education program and after hour community activities, as well serve as a detention area during storm events.

Houston ISD – Wharton Dual Language Academy
– Outstanding Project Award, Learning By Design, 2020

Scope of Work:
New addition and general renovations of the existing facilities to accommodate 750-900 students.

CONSTRUCTION
START: March 2017
FINISH: April 2018

TOTAL SQFT: 105,200

CAPACITY:
750-900 STUDENTS

CONSTRUCTION CONTRACT AMOUNT:
$28.6 Million

FACILITY COST/SQFT:
$272/SQ.FT.

CONTRACT TYPE:
CMAR

FIRM’S RESPONSIBILITY:
Prime Professional in Partner­ship with AutoArch

SERVICES:
Full service architectural and interior design services.

Scope of Work
New addition and extensive renovations of the existing facilities to accommodate 750- 900 students.

PROJECT TEAM:

Prinipal-in-Charge
Geof Edwards, AIA, LEED AP

Project Manager / Project Arch
Casey Annunzio, AIA, LEED AP

Project Coordinator
Victor Badillo, AIA, LEED AP

Ka Ki Chan

BiblioTech EDU
L.G. Pinkston High School
AT&T Center
Billy Earl Dade Middle School
Strasburger Price Law Firm